# 002005233699
Unscheduled inspection
Start date: 2020-11-17, end date: 2020-11-19, duration: 3
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisanii ot 6 fevralya 2020 g 56G3320H73 ot 16 yanvarya 2020 g 16G3320H73 ot 30 iyunya 2020 g 164G3320H73Zadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktovPredmetom proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo kontrolya nadzora
# 002004363301
Unscheduled inspection
Start date: 2020-04-17, end date: 2020-04-21, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 16 yanvarya 2020 g 16G3320H73Zadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktov7 Predmetom proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo kontrolya nadzora
# 002004156186
Unscheduled inspection
Start date: 2020-01-15, end date: 2020-01-16, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisanii ot 09 oktyabrya 2019 g 616G3320H73 ot 30 sentyabrya 2019 g 613G3320H73 28 oktyabrya 2019 g 655G3320H73Zadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktovPredmetom proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo kontrolya nadzora
# 001902865102
Unscheduled inspection
Start date: 2019-06-24, end date: —, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902708722
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-27, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 Ustanovit chtonastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisanii ot 18 marta 2019 g 190G3320H73 ot 18 marta 2019 g 200G3320H73Zadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktov7 Predmetom proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo kontrolya nadzora
# 001902609460
Unscheduled inspection
Start date: 2019-04-04, end date: 2019-04-09, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 24 yanvarya 2019 g 36G3320H73 Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva prinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktov
# 001902427159
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-01-24, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 18102018 g 760G3320H73
# 001801751465
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-10-18, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 26062018 g 471G3327H73
# 772101412745
Unscheduled inspection
Start date: 2021-12-02, end date: 2021-12-08, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101449460
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101449407
Unscheduled inspection
Start date: 2021-12-13, end date: 2021-12-15, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101311591
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101288456
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101313367
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101171510
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101284714
Unscheduled inspection
Start date: 2021-10-28, end date: 2021-11-09, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the verification of the fulfillment of the prescription; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the parameters of the capital construction facility with the maximum parameters of permitted construction, reconstruction of capital construction facilities established by the rules of land use and development, documentation according to the layout of the territory, and the mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code and other federal laws
# 772101249537
Unscheduled inspection
Start date: 2021-10-26, end date: 2021-11-03, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101239964
Unscheduled inspection
Start date: 2021-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100826925
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101171307
Unscheduled inspection
Start date: 2021-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101182593
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101240571
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101238545
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100581067
Unscheduled inspection
Start date: 2021-09-06, end date: 2021-09-17, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100505521
Unscheduled inspection
Start date: 2021-09-06, end date: 2021-09-30, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100902775
Unscheduled inspection
Start date: 2021-09-29, end date: 2021-10-05, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100848699
Unscheduled inspection
Start date: 2021-09-24, end date: 2021-10-21, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100820727
Unscheduled inspection
Start date: 2021-09-22, end date: 2021-09-29, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100823516
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100456634
Unscheduled inspection
Start date: 2021-08-16, end date: 2021-08-27, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100450325
Unscheduled inspection
Start date: 2021-08-12, end date: 2021-08-20, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100437103
Unscheduled inspection
Start date: 2021-08-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100570061
Unscheduled inspection
Start date: 2021-08-30, end date: 2021-09-03, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100413303
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100497013
Unscheduled inspection
Start date: 2021-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100359256
Unscheduled inspection
Start date: 2021-07-19, end date: 2021-07-23, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100340159
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100335757
Unscheduled inspection
Start date: 2021-07-12, end date: 2021-07-21, duration: 8
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100323999
Unscheduled inspection
Start date: 2021-07-05, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100296854
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-06-24, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100271553
Unscheduled inspection
Start date: 2021-06-14, end date: 2021-07-09, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100268158
Unscheduled inspection
Start date: 2021-06-09, end date: 2021-06-24, duration: 11
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100261397
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-21, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100274784
Unscheduled inspection
Start date: 2021-06-08, end date: 2021-06-22, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100271557
Unscheduled inspection
Start date: 2021-06-08, end date: 2021-06-15, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100273000
Unscheduled inspection
Start date: 2021-06-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100303264
Unscheduled inspection
Start date: 2021-06-25, end date: 2021-06-29, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100226757
Unscheduled inspection
Start date: 2021-06-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100191425
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-06-04, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100202872
Unscheduled inspection
Start date: 2021-05-12, end date: 2021-06-08, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100199003
Unscheduled inspection
Start date: 2021-05-12, end date: 2021-05-31, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100233267
Unscheduled inspection
Start date: 2021-05-25, end date: 2021-06-07, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100162823
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-27, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100127729
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-04-30, duration: 13
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100145763
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-04-27, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100086766
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-30, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100129844
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-04-27, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100130156
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-04-21, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100180396
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-30, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100110320
Unscheduled inspection
Start date: 2021-04-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100099414
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-23, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100089986
Unscheduled inspection
Start date: 2021-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105331588
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772105337615
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105332962
Unscheduled inspection
Start date: 2021-02-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005235881
Unscheduled inspection
Start date: 2020-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005235891
Unscheduled inspection
Start date: 2020-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005233699
Unscheduled inspection
Start date: 2020-11-17, end date: 2020-11-19, duration: 3
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisanii ot 6 fevralya 2020 g 56G3320H73 ot 16 yanvarya 2020 g 16G3320H73 ot 30 iyunya 2020 g 164G3320H73Zadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktovPredmetom proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo kontrolya nadzora
# 772005211069
Unscheduled inspection
Start date: 2020-11-03, end date: 2020-11-27, duration: 18
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005214248
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005151754
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005189610
Unscheduled inspection
Start date: 2020-10-20, end date: 2020-11-09, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005189608
Unscheduled inspection
Start date: 2020-10-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772005179126
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004475898
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004474471
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004483101
Unscheduled inspection
Start date: 2020-08-13, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004422653
Unscheduled inspection
Start date: 2020-06-03, end date: 2020-06-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004439529
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-07-17, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources
# 772004432590
Unscheduled inspection
Start date: 2020-06-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004415427
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004415411
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004414216
Unscheduled inspection
Start date: 2020-05-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002004363301
Unscheduled inspection
Start date: 2020-04-17, end date: 2020-04-21, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 16 yanvarya 2020 g 16G3320H73Zadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktov7 Predmetom proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo kontrolya nadzora
# 772004333464
Unscheduled inspection
Start date: 2020-03-05, end date: 2020-03-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004374116
Unscheduled inspection
Start date: 2020-03-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004313827
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development by the person being audited. The subject of the audit is to ensure that the person carrying out the construction fulfills the requirements of part 3 of Article 52 of the Urban Planning Code. The presence of construction specialists, chief engineers of the project, the conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such the requirements of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 772004388088
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-03-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverkiprovedenie meropriyatii po kontrolyu v svyazi s proverkoi vypolneniya predpisaniyaZadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkiproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzoromsrokom ispolneniya do 23032020
# 772004359531
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-03-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004265833
Unscheduled inspection
Start date: 2020-02-06, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004248196
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004252169
Unscheduled inspection
Start date: 2020-02-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004241003
Unscheduled inspection
Start date: 2020-01-29, end date: 2020-01-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 002004156186
Unscheduled inspection
Start date: 2020-01-15, end date: 2020-01-16, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisanii ot 09 oktyabrya 2019 g 616G3320H73 ot 30 sentyabrya 2019 g 613G3320H73 28 oktyabrya 2019 g 655G3320H73Zadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktovPredmetom proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo kontrolya nadzora
# 772004201119
Unscheduled inspection
Start date: 2020-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004218544
Unscheduled inspection
Start date: 2020-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004214561
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-02-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverkiprovedenie meropriyatii po kontrolyu v svyazi s postupleniem izvescheniya zastroischika zakazchikaZadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkivypolnenie licom osuschestvlyayuschim stroitelstvotrebovanii chasti 3 stati 52 Gradostroitelnogo kodeksanalichie specialistov po organizacii stroitelstva glavnyh inzhenerov proektasootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 772004223036
Unscheduled inspection
Start date: 2020-01-24, end date: 2020-02-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 771904050430
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision
# 771904086020
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverkiprovedenie meropriyatii po kontrolyu v svyazi s proverkoi vypolneniya predpisaniyaZadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkivypolnenie predpisaniya Mosgosstroinadzoraso srokom ustraneniya 25112019