Found 94 inspections:

# 662101528309
Unscheduled inspection
Start date: 2021-12-30, end date: 2022-01-14, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-14-29/123 dated 09/17/2021 issued by GUP InvestStroy LLC, the purpose of this inspection is to carry out regional state construction supervision. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 09/17/2021 No. 29-14-29/123, issued by GUP InvestStroy LLC.


# 662101409225
Unscheduled inspection
Start date: 2021-11-29, end date: 2021-12-24, duration: 7
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program No. 29-17-15/154-20 dated 06/01/2021 (Amendment No. 2), the task of this inspection is to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Administrative Building with underground Parking (No. 1 according to ROM)", located at 11 Rosa Luxemburg St. / 16 Engels St., Yekaterinburg, as well as the results of such work with the requirements approved in accordance with with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Development Code of the Russian Federation.


# 662101319480
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 662100643299
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662100643734
Unscheduled inspection
Start date: 2021-09-13, end date: 2021-09-24, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 662100644243
Unscheduled inspection
Start date: 2021-09-13, end date: 2021-09-24, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 662100605732
Unscheduled inspection
Start date: 2021-09-09, end date: —, duration:
Authority:
Purpose of inspection:


# 662100549501
Unscheduled inspection
Start date: 2021-09-06, end date: 2021-09-17, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 40/09 (amendment 2) dated 2020-09-23; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work and applicable building materials during the construction of a capital construction facility: An administrative building (No. 1 according to ROM) with underground parking (No. 2 according to ROM) located at: Yekaterinburg, Verkh-Isetsky district, Cherepanova St., 28, the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and requirements equipment of the capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100312806
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 662100284135
Unscheduled inspection
Start date: 2021-06-09, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: protection of the rights and interests of employees


# 662100210464
Unscheduled inspection
Start date: 2021-05-25, end date: 2021-06-22, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-16-01/161-19 dated 2020-12-22; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Residential block section with built-in non-residential premises in the basement and on the ground floor (No. 1.6 according to ROM) is the 4th stage of construction, located at the address: Sverdlovsk region, Yekaterinburg, Krugovaya - Moskvina - Preschool Street, the results of such work meet the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code Of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662005153207
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662005183910
Unscheduled inspection
Start date: 2020-10-15, end date: 2020-11-12, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 291701442181 dated 20200803 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility A material warehouse building for 7 boxes 12 according to ROM 2 stage of the 1st stage of construction located at the address Sverdlovsk region Yekaterinburg Akademika Vonsovskiy 1a the results of such work with the requirements approved in accordance with with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federations


# 662004480329
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration:
Authority:
Purpose of inspection:


# 662004457489
Unscheduled inspection
Start date: 2020-07-23, end date: —, duration:
Authority:
Purpose of inspection:


# 662004436888
Unscheduled inspection
Start date: 2020-06-16, end date: —, duration:
Authority:
Purpose of inspection:


# 662004369188
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-03, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations of the task implementation of regional state construction supervision Subject to the implementation of a previously issued instruction on the elimination of identified violations of mandatory requirements


# 662004262516
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-03-06, duration: 14
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations of the task implementation of regional state construction supervision Subject to the implementation of a previously issued instruction on the elimination of identified violations of mandatory requirements


# 662004166370
Unscheduled inspection
Start date: 2020-01-13, end date: —, duration:
Authority:
Purpose of inspection:


# 662004197014
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-28, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707822 P dated December 06, 2019 Task to carry out state construction supervision Subject to the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707822 P dated December 06, 2019


# 661904061421
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of paragraphs 1 2 5 6 7 of the previously issued regulation on the elimination of detected violations of mandatory requirements 291707517 P dated September 13, 2019 Task is to carry out state construction supervision Subject is the implementation of paragraphs 1 2 5 6 7 of the previously issued regulation on the elimination of detected violations of mandatory requirements 291707517 P dated September 13, 2019


# 661903993307
Unscheduled inspection
Start date: 2019-11-22, end date: 2019-12-02, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291707572 dated August 16, 2019The task is to carry out state construction supervision on the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291707572 dated August 16, 2019


# 661903919422
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration:
Authority:
Purpose of inspection:


# 661903836734
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-25, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program dated 15082019 29160126119 The objectives of this audit are to carry out regional state construction supervision.[7] The subject of this audit is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Residential block section with built-in non-residential premises in the basement and on the ground floor 16 according to ROM stage 4 construction" located in the Sverdlovsk region Yekaterinburg Krugovaya Moskvina Street Preschool as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model They are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, having a construction permit, meeting the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation.


# 661903836617
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-25, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program dated 11022019 228067 is to carry out regional state construction supervision.[7] The subject of this audit is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Multi-storey two-section residential building with non-residential premises in the basement at otm 3000 with built-in office space on the basement and 1st floors with facilities for bicycle storage on 213 floors 5 on ROM" located at Yekaterinburg, Chkalovsky district, Roshchinskaya St., 225 meters east of the landmark 29A, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with by parts 38 and 39 of Article 49 of the Urban Development Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with energy metering devices resources for obtaining a building permit and meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661903805678
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration:
Authority:
Purpose of inspection:


# 661903805567
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-31, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program dated February 04, 2019 29160150517. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and construction materials used during the construction of the capital construction facility "18-storey residential building with built-in premises of a preschool club 1 on ROM and a built-in two-level underground parking 2 according to the ROM mechanized parking lot 3 according to the ROM" located at 23 Opalikhinskaya St., Yekaterinburg, Sverdlovsk Region, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code Of the Russian Federation and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661903684199
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-18, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of paragraphs 3 to 4 of the previously issued order to eliminate the identified violation of mandatory requirements 291707517 P dated September 13, 2019 The task is to carry out state construction supervision The subject is the implementation of paragraphs 3 to 4 of the previously issued order to eliminate the identified violation of mandatory requirements 291707517 P dated September 13, 2019


# 661903683446
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-18, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707416 P dated July 05, 2019 Task implementation of state construction supervision Subject to the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707416 P dated July 05, 2019


# 661902689560
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration:
Authority:
Purpose of inspection:


# 661902689681
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661902717147
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration:
Authority:
Purpose of inspection:


# 661902679697
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-08, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707783 P dated November 16, 2018 The task is to carry out state construction supervision The subject is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291707783 P dated November 16, 2018


# 661902511248
Unscheduled inspection
Start date: 2019-02-18, end date: —, duration:
Authority:
Purpose of inspection:


# 661802182892
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program. The task is to carry out regional state construction supervision. The subject is to verify that the work performed and the applicable building materials during the construction of the capital construction facility comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 to 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661802183047
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose to monitor the implementation of the previously issued regulation on the elimination of identified violations of mandatory requirements 291607415 dated July 12, 2018 Task implementation of regional state construction supervision Subject to the implementation of the previously issued regulation on the elimination of identified violations of mandatory requirements 291607415 dated July 12, 2018


# 661802081149
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration:
Authority:
Purpose of inspection:


# 661801894895
Unscheduled inspection
Start date: 2018-10-22, end date: —, duration:
Authority:
Purpose of inspection:


# 661801894728
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-10-30, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate identified violations of mandatory requirements 291607577P dated August 21, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate identified violations of mandatory requirements 291607577P dated August 21, 2018.


# 661801515766
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 661801235432
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-10-12, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to monitor the implementation of paragraph 21 of the previously issued order to eliminate the identified violation of mandatory requirements 291607174 dated April 06, 2018. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to comply with paragraph 21 of the previously issued order to eliminate the identified violation of mandatory requirements 291607174 dated April 06, 2018.


# 661800603164
Unscheduled inspection
Start date: 2018-08-08, end date: —, duration:
Authority:
Purpose of inspection:


# 661800603218
Unscheduled inspection
Start date: 2018-08-08, end date: 2018-08-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607299P1 dated May 28, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607299P1 dated May 28, 2018.


# 661800646899
Unscheduled inspection
Start date: 2018-08-21, end date: —, duration:
Authority:
Purpose of inspection:


# 661800513486
Unscheduled inspection
Start date: 2018-07-02, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800456281
Unscheduled inspection
Start date: 2018-06-15, end date: 2018-06-28, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose to monitor the implementation of the previously issued regulation on the elimination of identified violations of mandatory requirements 291607211 dated April 27, 2018 Task implementation of regional state construction supervision Subject to the implementation of the previously issued regulation on the elimination of identified violations of mandatory requirements 291607211 dated April 27, 2018


# 661800456170
Unscheduled inspection
Start date: 2018-06-15, end date: 2018-07-12, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29160150517 dated 27122017 Task is to carry out regional state construction supervision Subject is to verify the compliance of work and applicable building materials during the construction of the capital construction facility "18-storey residential building with built-in premises of a preschool club 1 on ROM and a built-in two-level underground parking 2 on ROM mechanized parking lot 3 on ROM" located at the address Sverdlovskaya Yekaterinburg region, Opalikhinskaya str., 23, the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661800473722
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-22, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707211 P dated April 06, 2018 The task is to carry out state construction supervision The subject is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707211 P dated April 06, 2018


# 661800488601
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-07-06, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607174 dated April 06, 2018, with the exception of paragraph 21. The task is to carry out regional state construction supervision. The subject is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607174 dated April 06, 2018.


# 661800351513
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-06-04, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707155P dated March 30, 2018. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291707155P dated March 30, 2018.


# 661800337782
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-28, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to implement the inspection program 22806 5 dated May 24, 2017. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of work and applicable building materials during the construction of the capital construction facility "Multi-storey two-section residential building with non-residential premises in the basement at otm 3000 with built-in office space on the ground and 1st floors with bicycle storage rooms on floors 213, 5 on ROM" located at Yekaterinburg, Chkalovsky district, Roshchinskaya St., 225 meters east of the landmark house 29A, the results of such work meet the requirements of technical regulations for project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used as well as the availability of a building permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661800326121
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160745P1 dated February 20, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160745P1 dated February 20, 2018.


# 661800241948
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 29160150517 dated 27122017 Task implementation of regional state construction supervision Subject to compliance of work and applicable building materials during the construction of the capital construction facility "18-storey residential building with built-in premises of a preschool club 1 on ROM and a built-in two-level underground parking 2 on ROM mechanized parking lot 3 on ROM" located at the address Yekaterinburg 23 Opalikhinskaya Street the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661800194418
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-04-06, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160561 dated February 16, 2018 The task is to carry out regional state construction supervision The subject is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160561 dated February 16, 2018


# 661800198474
Unscheduled inspection
Start date: 2018-03-06, end date: 2018-04-04, duration:
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: supervision and control over compliance with labor legislation and other normative legal acts containing norms of labor rightsin connection with the consideration of appeal No. 7124818OB On violations of labor legislationexamination and control over compliance with labor legislation and other normative legal acts containing norms of labor law


# 661800009237
Unscheduled inspection
Start date: 2018-01-24, end date: —, duration:
Authority:
Purpose of inspection:


# 66170802912994
Unscheduled inspection
Start date: 2017-11-29, end date: 2017-12-25, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to monitor the implementation of the previously issued regulation 291605778 P dated 31102017, as well as on the basis of the notice of elimination of violations 29018246611 dated 20112017 and the notice of completion of construction bx 46852 dated 2112017, the subject is to verify the compliance of the constructed capital construction facility "2 start-up complex 1section block section with integrated office space in the basement 72 on GP located at Yekaterinburg Chkalovsky district Roshchinskaya St. Patriotov St. Yakutskaya St. the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit, the objectives of this verification task are the implementation of regional state construction supervision


# 66170802656096
Unscheduled inspection
Start date: 2017-10-06, end date: —, duration:
Authority:
Purpose of inspection:


# 66170802656062
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-31, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose of the inspection program 30120414212 dated July 20, 2017 tasks implementation of regional state construction supervision subject to verification of compliance with the performance of work and applicable building materials during the construction of the capital construction facility "2 start-up complex 1section block section with integrated office space in the basement 72 on GP" located at Yekaterinburg Chkalovsky district Roshchinskaya St. Patriotov St. Yakutskaya of the results of such work to the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 66170802060153
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-09-22, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: monitoring the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 290605299 P1 dated May 18, 2017, the objectives of this audit are the implementation of regional state construction supervision


# 66170701857663
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-31, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Verification of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605480 P dated July 06, 2017. verification of the compliance of the work and applicable building materials during the construction of the capital construction facility with the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of permits for construction and fulfillment of the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 66170701668406
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-07-06, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: in order to implement the inspection program 2916018617 dated April 06, 2017, to verify the compliance of the work and applicable building materials during the construction of the capital construction facility, " Residential part of the 9-storey section 15, stage 3 of construction, Built-in store premises on the ground floor and non-residential auxiliary premises in the basement of section 15, stage 4 of construction, an apartment building with variable number of floors with non-residential premises on the first floors 1 according to the ROM located at the address city of Yekaterinburg Krugovaya Moskvina Street Preschool


# 66170701615889
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-26, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29140284 dated March 10, 2017. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued instruction on the elimination of identified violations of mandatory requirements 29140284 dated March 10, 2017


# 66170701615836
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-16, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29140265P1 dated February 22, 2017. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued instruction on the elimination of identified violations of mandatory requirements 29140265P1 dated February 22, 2017


# 66170701613434
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-29, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: monitoring the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605109P1 dated February 27, 2017, the objectives of this audit are the implementation of regional state construction supervision


# 66170701547087
Unscheduled inspection
Start date: 2017-04-18, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170701472862
Unscheduled inspection
Start date: 2017-04-17, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701524283
Unscheduled inspection
Start date: 2017-04-20, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701463613
Unscheduled inspection
Start date: 2017-03-20, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170701423571
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-07, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program dated October 14, 2016 30120414212. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "2 start-up complex 1 section block section with integrated office space in the basement 72 on GP from the structure of the facility Four sections of a 6-section residential building of variable storeys with built-in office space in the basement block section 72 with bicycle storage rooms on 218 floors and with non-residential auxiliary premises in the basement at otm 2600 and at otm 5600 section 73 72 73 on GP" located at Yekaterinburg Chkalovsky district Roshchinskaya St. Patriotov St. Yakutskaya the results of such the requirements of technical regulations, sanitary and epidemiological rules and regulations, safety rules and state standards for project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 66170701369406
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-03-02, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 2916041038 P1 dated December 16, 2016. The objectives of this inspection are the implementation of regional state construction supervision


# 66170701370857
Unscheduled inspection
Start date: 2017-02-13, end date: 2017-02-24, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 30120414212 dated October 14, 2016. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "2 start-up complex 1 section block section with integrated office space in the basement 72 on GP from the structure of the facility Four sections of a 6-section residential building of variable storeys with built-in office space in the basement block section 72 with bicycle storage facilities on 218 floors and with non-residential auxiliary premises in the basement at otm 2600 and at otm 5600 section 73 72 73 on GP" located at Yekaterinburg Chkalovsky district Roshchinskaya St. Patriotov St. Yakutskaya the results of such the requirements of technical regulations, fire safety requirements, safety rules and state standards for project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 66170701308207
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 66160701238196
Unscheduled inspection
Start date: 2016-12-15, end date: —, duration:
Authority:
Purpose of inspection:


# 66160701214359
Unscheduled inspection
Start date: 2016-12-06, end date: 2016-12-09, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291402566 dated October 26, 2016The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291402566 dated October 26, 2016The task of this audit is to carry out state construction supervision


# 66160701261587
Unscheduled inspection
Start date: 2016-12-22, end date: 2016-12-29, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: monitoring of the execution of the previously issued instruction on the elimination of identified violations of mandatory requirements 291604783 P dated October 27, 2016


# 66160701071528
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-18, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: monitoring of the execution of the previously issued order to eliminate the identified violation of mandatory requirements 291604595 P1 dated August 29, 2016


# 66160701071448
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-17, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: monitoring of the execution of the previously issued order to eliminate the identified violation of mandatory requirements 291604597 P1 dated August 31, 2016


# 66160701061093
Unscheduled inspection
Start date: 2016-11-01, end date: 2016-11-25, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291302484 dated September 05, 2016The purpose of this inspection is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291302484 dated September 05, 2016The task of this inspection is to carry out state construction supervision


# 66160700987718
Unscheduled inspection
Start date: 2016-10-17, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66160700865336
Unscheduled inspection
Start date: 2016-10-17, end date: —, duration:
Authority:
Purpose of inspection:


# 66160701061713
Unscheduled inspection
Start date: 2016-10-31, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66160701040046
Unscheduled inspection
Start date: 2016-10-31, end date: 2016-11-04, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 301204476123 dated November 20, 2015, the objectives of which are to carry out state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Multi-apartment residential building with variable storeys with non-residential premises on the ground floors 1 on ROM underground garage 3 on ROM transformer substation 2 according to the ROM" located at Yekaterinburg, Chkalovsky district, Krugovaya St., Moskvina St., Preschool St., the results of such work to building codes and rules, sanitary and epidemiological rules and regulations, safety rules and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 66160700148823
Unscheduled inspection
Start date: 2016-09-22, end date: 2016-09-29, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: execution of the order on elimination of the revealed violation of mandatory requirements 291604391P1 dated 28062016


# 66160700598605
Unscheduled inspection
Start date: 2016-09-12, end date: 2016-09-16, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: verification of the conformity of work performed and applicable building materials during the construction of the capital construction facility "3 launch complex 3-section block section with bicycle storage rooms on 218 floors and non-residential auxiliary premises in the basement at OTM 2600 and at OTM 5600 73 according to gp there are four sections of a 6-section residential building of variable storeys with integrated office space in the basement block of section 72 with bicycle storage rooms on 218 floors and with non-residential auxiliary rooms in the basement at otm 2600 and at otm 5600 of section 73 72 73 according to GP" located at Yekaterinburg, Chkalovsky district, Roshchinskaya St., Patriotov St., Yakutskaya, the results of such work are building codes and rules sanitary and epidemiological rules and regulations safety rules and state standards as well as requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 66160700560408
Unscheduled inspection
Start date: 2016-09-12, end date: 2016-09-30, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: verification of the compliance of the work and applicable building materials during the construction of a capital construction facility "Multi-storey two-section residential building with built-in non-residential public premises located in the basement and on the 1st floor 5 according to ROM 3 stage of construction" located at Yekaterinburg, Chkalovsky district, Roshchinskaya St., Patriotov St., Yakutskaya, the results of such work with building regulations and sanitary and epidemiological rules safety regulations and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 66160601750599
Unscheduled inspection
Start date: 2016-08-04, end date: 2016-08-29, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the inspection program 301204476123 dated November 20, 2015, the objectives of which are to carry out state construction supervision


# 66160601756529
Unscheduled inspection
Start date: 2016-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 66160601750571
Unscheduled inspection
Start date: 2016-08-03, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66160601775474
Unscheduled inspection
Start date: 2016-08-09, end date: —, duration:
Authority:
Purpose of inspection:


# 66160700483749
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-09, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: verification of the compliance of the work and applicable building materials during the construction of the capital construction facility "Residential building of variable storeys with non-residential premises on the ground floors and an underground garage" located at Yekaterinburg, Krugovaya St., Moskvina St., Preschoolnaya St., Yekaterinburg, the results of such work with building codes and rules, sanitary and epidemiological rules and regulations, safety rules and state standards, as well as requirements other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 66160601750779
Unscheduled inspection
Start date: 2016-08-15, end date: —, duration:
Authority:
Purpose of inspection:


# 66160601672680
Unscheduled inspection
Start date: 2016-05-25, end date: 2016-06-21, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Implementation of the inspection program 30120414312 dated 30112015


# 66160601568358
Unscheduled inspection
Start date: 2016-03-18, end date: 2016-03-25, duration:
Authority: Upravlenie po voprosam migracii Glavnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii po Sverdlovskoi oblasti
Purpose of inspection: Compliance with Russian migration legislation