Found 37 inspections:

# 772100096486
Unscheduled inspection
Start date: 2021-03-26, end date: 2021-04-09, duration: 11
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the inspection: to carry out control measures in connection with checking the fulfillment of the instruction, based on the expiration of the deadline for the legal entity to comply with the instruction issued by Mosgosstroynadzor on the elimination of identified violations of mandatory requirements dated 09/08/2020 No. 32/20P. Verification tasks: prevention, detection and suppression of violations by legal entities operating in the field of industrial safety, their managers and other officials, and their authorized representatives of the requirements established by Federal Law No. 116-FZ of July 21, 1997 "On Industrial Safety of Hazardous Production Facilities", other federal laws and adopted in accordance with them other regulatory legal acts of the Russian Federation in the field of industrial safety. Subject of the audit: verification of the elimination of violations specified in the order dated 08.09.2020 No. 32/20P (with a deadline of 22.03.2021), issued by Mosgosstroynadzor, based on the expiration of the period for the execution of the issued order by a legal entity.


# 772004488987
Unscheduled inspection
Start date: 2020-08-12, end date: —, duration:
Authority:
Purpose of inspection:


# 772004355432
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-03-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004269508
Unscheduled inspection
Start date: 2020-02-07, end date: 2020-02-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 771904080378
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person. The subject is to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for used energy resourcesperformance by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code


# 771904005641
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 771903936963
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-11-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903953260
Unscheduled inspection
Start date: 2019-11-12, end date: —, duration:
Authority:
Purpose of inspection:


# 771903988832
Unscheduled inspection
Start date: 2019-11-19, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 771903893771
Unscheduled inspection
Start date: 2019-10-24, end date: —, duration:
Authority:
Purpose of inspection:


# 771903843703
Unscheduled inspection
Start date: 2019-10-11, end date: —, duration:
Authority:
Purpose of inspection:


# 771903639441
Unscheduled inspection
Start date: 2019-09-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803138813
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 001800312630
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-13, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the execution of the order from 09022018 32568


# 77180803114660
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803119227
Unscheduled inspection
Start date: 2018-04-04, end date: 2018-04-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the orders of the Government of the Russian Federation on the basis of orders of the head of the Deputy head of the Moscow state construction supervision of the inspection issued in accordance with the instructions of the Government of the Russian Federation 14112017 РДП77580 and regulation of the Government of the Russian Federation dated June 09, 2017 689 "About some measures for implementation of the Decree of the President of the Russian Federation of 09 may 2017 202 "On the use of enhanced security measures during the in the Russian Federation of the FIFA world Cup 2018 FIFA and the FIFA confederations Cup 2017" conducting Supervisory activities including prevention detection and suppression of violations of the completed works and also the results of such work to the requirements of technical regulations of the regulations and design documentation warning detection and suppression of violations of requirements of industrial safety safety Regulations and technical regulations in the design of the construction, reconstruction operation decommissioning and liquidation of facilities of the Moscow metro in respect of assets of organizations falling under the regime of enhanced security measures during the world Cup 2018 FIFA compliance with legal entities, their leaders and other officials, individual entrepreneurs, their authorized persons, respectively, further legal persons, individual entrepreneurs in the implementation of activities in the field of industrial safety requirements established by Federal law 116ФЗ other Federal laws adopted in accordance with them other normative legal acts of the Russian Federation in the field of industrial safety and compliance with the specified requirements used buildings premises buildings of technical devices, equipment, material and ongoing technological processes


# 77180803104118
Unscheduled inspection
Start date: 2018-03-21, end date: 2018-03-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803096444
Unscheduled inspection
Start date: 2018-03-02, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803079118
Unscheduled inspection
Start date: 2018-02-15, end date: 2018-02-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800019140
Unscheduled inspection
Start date: 2018-01-15, end date: 2018-02-09, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating Tower cranes" based on the instruction of Deputy Prime Minister of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating Tower cranes from 2017 to 2019" By the objectives of this inspection are the prevention detection and suppression of violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts 7 The subject of this audit is compliance with legal by a person in the course of carrying out activities of mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices for lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings, premises, structures, equipment and materials used, as well as requirements for machinery and equipment and processes related to the requirements for these products Operation and disposal


# 77180803059295
Unscheduled inspection
Start date: 2018-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802928946
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802787158
Unscheduled inspection
Start date: 2017-10-31, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701900061
Unscheduled inspection
Start date: 2017-08-17, end date: 2017-08-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170801922521
Unscheduled inspection
Start date: 2017-08-24, end date: 2017-08-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701707970
Unscheduled inspection
Start date: 2017-07-10, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701756659
Unscheduled inspection
Start date: 2017-07-04, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701714282
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-06-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701614607
Unscheduled inspection
Start date: 2017-05-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701438690
Unscheduled inspection
Start date: 2017-03-06, end date: 2017-03-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701463301
Unscheduled inspection
Start date: 2017-03-21, end date: 2017-03-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701361903
Unscheduled inspection
Start date: 2017-02-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701310763
Unscheduled inspection
Start date: 2017-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701250101
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701085114
Unscheduled inspection
Start date: 2016-11-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701035994
Unscheduled inspection
Start date: 2016-10-25, end date: 2016-10-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: elimination of violations specified in the order issued by Mosgosstroynadzor 9164161 dated 23092016 based on the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements, the objectives of this audit are to prevent identify and suppress violations of technical regulations and project documentation by the person being audited. The purpose of this audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 9164161 dated 23092016


# 77160700068710
Unscheduled inspection
Start date: 2016-09-09, end date: 2016-09-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program The tasks of this audit are to prevent identify and suppress violations of technical regulations and project documentation committed by the audited person. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including among the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used