Found 100 inspections:

# 002005160110
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration:
Authority:
Purpose of inspection:


# 002004422954
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-11, duration: 9
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor, dated December 27, 2019. 4200718 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation Compliance of the work and the applied building materials and the results during the construction of the capital construction facility construction "Technical project for the development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the licensed areas "Field of the Uvalnaya mine" and "Uvalny Glubokoe" Adjustment of step 1 5" as well as the results of such work of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources availability of a construction permit compliance with the requirements Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004311368
Unscheduled inspection
Start date: 2020-02-04, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004251191
Unscheduled inspection
Start date: 2020-02-05, end date: —, duration:
Authority: Verhneobskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection:


# 001904100765
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution of the violation specified in the instruction of the Siberian Directorate of Rostechnadzor dated 15112019 2501316, the deadline for which has expired Verification of the elimination by a legal entity of the violation specified in the instruction on the elimination of violations dated 15112019 2501316, the deadline for which has expired Compliance with the instructions of the federal state construction supervision authorities


# 001903912203
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902839342
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902606717
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-19, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by the Deputy Head of the Siberian Directorate of Rostechnadzor dated 06022018 4200718 Prevention detection and suppression of violations of the legislation on urban development activities by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of the work and the applied building materials and results during the construction of the capital construction facility "Technical Project development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the license areas "Field of the Uvalnaya Mine" and "Uvalny Glubokoe" Adjustment of Step 1 5, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001802171290
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution of the instruction of the Siberian Directorate of Rostechnadzor dated 31102018 2501236 on the elimination of identified offenses based on the notice of JSC Sibirskaya Management Company dated 16112018 181892OX vh 1318034 dated 16112018 on the elimination of violations Prevention detection and suppression of violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor including project documentation, Compliance with the regulations of the federal state construction supervision authorities


# 001802098705
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Notification of Sibirskaya Management Company JSC on the completion of construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including project documentation, Compliance control of work and construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation during the construction of the capital construction facility "Technical project development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the licensed areas "Field of the Uvalnaya mine" and "Uvalny Glubokoe" Correction of the 1st stage" located at the address Kemerovo region Novokuznetsk municipal district Uval


# 001801696466
Unscheduled inspection
Start date: 2018-10-08, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800681129
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800615208
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility based on the inspection program dated 06022018 4200718 Prevention detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and applied building materials and results during the construction of a capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 001800093750
Unscheduled inspection
Start date: 2018-03-01, end date: 2018-03-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and construction materials used and results during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation, including energy requirements efficiency and requirements for equipping the capital construction facility with metering devices for used energy resources availability of a construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170802989913
Unscheduled inspection
Start date: 2017-12-26, end date: 2017-12-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: KIP 1411PTSE096 from 22092017


# 00170802920045
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802805842
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the performed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility Prevention detection and suppression of violations of the legislation on urban development by the developer and technical customer, including the requirements of technical regulations of the project documentation. Compliance of the work and the applied building materials and results during the construction of the facility capital construction as well as the results of such work, the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, the need for a construction permit to comply with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170801957840
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the fulfillment by JSC Sibirskaya Management Company of the requirements of a previously issued instruction on the elimination of violations, the deadline for which has expired Verification of the elimination by a legal entity of the violations identified in the instruction on the elimination of violations, the deadline for which has expired Fulfillment by the audited entity of the instruction of the Siberian Directorate of Rostechnadzor


# 00170701671184
Unscheduled inspection
Start date: 2017-06-05, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701563107
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-19, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the capital construction facility "Technical project for the development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the licensed areas "Field of the Uvalny mine" and "Uvalny Glubokoe" Stage 3" located at the address Kemerovo region Novokuznetsk municipal district Uval on the basis of the inspection program from 15022017 to 4201217 Prevention detection and suppression violations of the legislation on urban development by the developer and the technical customer, including the requirements of the technical regulations of the project documentation, Compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility "Technical project for the development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the licensed areas "Field of the Uvalny mine" and "Uvalny Glubokoe" Stage 3" as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170701418869
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision of a capital construction facility on the basis of a notice of completion of construction of a capital construction facility, preventing the identification and suppression of violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations for project documentation, and compliance of work performed and construction materials used and results during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170701343479
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-17, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the fulfillment by JSC Sibirskaya Management Company of the requirements of a previously issued instruction on the elimination of violations Verification of the elimination by a legal entity of the violations identified in the instruction on the elimination of violations Compliance by the audited entity with the instructions of the Siberian Rostechnadzor Department


# 00160701076838
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The implementation of the state construction supervision of the capital construction object on the basis of the letter of carrying out the final inspection in the process of state construction supervision of the capital construction object "construction of a mine "Evalina" JSC "UK Sibirskaya" 1 turn the Adjustment of technical solutions in terms of reserves extraction layer 67 in the northeastern borders of the block stage 3" at Kemerovo oblast Novokuznetsk municipal district p Valpromaro of the presence and compliance of licensing proektnosmetnoy and documentation requirements of the town planning code of the Russian Federation and other regulatory documents as well as the requirements of other regulatory legal acts of the Russian Federation and normative legal acts of Federal Executive bodies enforceable in the construction, reconstruction and capital repair of facilities capital stroitelstva.novy compliance with the requirements of the legislation in the field of industrial securitycheck availability normativeness documentlibrary compliance of the performed works to the requirements of technical regulations of the rules and regulations other regulations and project documentation for reconstruction of capital construction object "construction of a mine "Evalina" JSC "Siberian UK" 1 turn the Adjustment of technical solutions in terms of reserves extraction layer 67 in the northeastern borders of the block, 3rd stage" at the address Kemerovo oblast Novokuznetsk municipal district p Valpromaro of the presence and compliance of licensing proektnosmetnoy and documentation requirements of the town planning code of the Russian Federation and other regulatory documents as well as the requirements of other regulatory legal acts of the Russian Federation and normative legal acts of Federal Executive bodies enforceable in the construction, reconstruction and capital repair of objects of capital stroitelstva.novy the compliance of the work performed application of building materials and the results of such work, the construction rules and regulations, sanitary and epidemiological rules and regulations of requirements of fire safety


# 00160701076833
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The implementation of the state construction supervision of the capital construction object on the basis of the letter of carrying out the final inspection in the process of state construction supervision of the capital construction object "construction of a mine "Evalina" JSC "Siberian UK" 1 turn the Adjustment of technical solutions in terms of reserves extraction layer 67 in the northeastern borders of the block stage 2 at the address Kemerovo oblast Novokuznetsk municipal district p Valpromaro of the presence and compliance of licensing proektnosmetnoy and documentation requirements of the town planning code of the Russian Federation and other regulatory documents as well as the requirements of other regulatory legal acts of the Russian Federation and normative legal acts of Federal Executive bodies enforceable in the construction, reconstruction and capital repair of facilities capital stroitelstva.novy compliance with the requirements of the legislation in the field of industrial securitycheck availability normativeness documentlibrary compliance of the performed works to the requirements of technical regulations of the rules and regulations other regulations and project documentation for reconstruction of the object of capital the construction of the "construction of the mine "Evalina" JSC "UK Sibirskaya" 1 turn the Adjustment of technical solutions in terms of reserves extraction layer 67 in the northeastern borders of the block stage 2" at Kemerovo oblast Novokuznetsk municipal district p Valpromaro of the presence and compliance of licensing proektnosmetnoy and documentation requirements of the town planning code of the Russian Federation and other regulatory documents as well as the requirements of other regulatory legal acts of the Russian Federation and normative legal acts of Federal Executive bodies enforceable in the construction, reconstruction and capital repair of objects of capital stroitelstva.novy the compliance of the work performed application of building materials and the results of such work, the construction rules and regulations, sanitary and epidemiological rules and regulations of requirements of fire safety


# 00160701074683
Unscheduled inspection
Start date: 2016-11-07, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00160700995125
Unscheduled inspection
Start date: 2016-10-12, end date: 2016-10-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "Construction of the Uvalnaya mine" of JSC Sibirskaya Management Company Stage 1 Adjustment of technical solutions regarding the development of reservoir 67 reserves within the boundaries of the northeast block Stage 3 at the address Kemerovo region Novokuznetsk Uval municipal district Prevention detection and suppression of violations of the legislation on urban planning activities committed by the developer and the technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and construction materials used and results during the reconstruction of the capital construction facility "Construction of the Uvalnaya mine" by JSC Sibirskaya Management Company Stage 1 Adjustment of technical solutions regarding the development of reserves formation 67 within the boundaries of the northeast block Stage 3" as well as the results of such work to the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00160700693365
Unscheduled inspection
Start date: 2016-09-19, end date: 2016-09-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to monitor the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "Construction of the Uvalnaya mine of JSC Sirskaya Management Company Stage 1. Adjustment of technical solutions regarding the development of reservoir 67 reserves within the boundaries of the northeast block Stage 2."The objectives of this The purpose of the inspection is to prevent identify and suppress violations of the legislation on urban planning activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 00160601567680
Unscheduled inspection
Start date: 2016-04-06, end date: 2016-04-29, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of the state construction supervision


# 00160601547273
Unscheduled inspection
Start date: 2016-03-01, end date: 2016-03-18, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of state construction supervision


# 422101358045
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The goal is to match the work performed and the construction materials and products used in the process of excavation, installation of culverts, installation of ditches, excavation and underlying layers of pavement, installation of industrial and fire-fighting water supply. The task is to verify compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. The subject is compliance with the mandatory requirements of the legislation of the Russian Federation.


# 422100550407
Unscheduled inspection
Start date: 2021-09-02, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials and products used in the course of excavation, installation of culverts, installation of ditches, excavation and underlying layers of pavement, installation of industrial and fire-fighting water supply. The task is to verify compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. The subject is compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning.


# 422100351608
Unscheduled inspection
Start date: 2021-07-13, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify that the work performed and the construction materials used during the construction of the linear facility, as well as the results of such work, meet the requirements of the design documentation. The task is to verify compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the reconstruction of a capital construction facility. The subject is compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning.


# 422100314271
Unscheduled inspection
Start date: 2021-06-24, end date: —, duration:
Authority:
Purpose of inspection:


# 422100217472
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 9
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - Control of the execution of the instruction of the Siberian Rostechnadzor Department on the elimination of identified violations, based on the notification of the elimination of identified violations. - Prevention, detection and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor). - Is the fulfillment of the instructions of the federal state construction supervision authorities.


# 422100217355
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: -Prevention, detection and suppression of violations of the legislation on urban development activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out the construction of capital construction on the basis of a contract with the developer or the customer (contractor). - Compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility "Uvalnaya Processing Plant" of JSC Sibirskaya Management Company. A dump for storing coal processing waste. Adjustment", as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (in the case of if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply), including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of building permits; compliance with the requirements of parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 542100154369
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-05-13, duration: 20
Authority: Verhneobskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection: Objectives: implementation of measures for state control (supervision) over the execution by JSC Sibirskaya Coal Company of the previously issued regulation on the elimination of violations of the environmental legislation of the Russian Federation regarding the protection of aquatic biological resources and their habitat dated 02/27/2020 No. 1162/1P-20 in connection with the expiration of the specified regulation on 06/27/2020. Tasks: compliance with the requirements of the legislation of the Russian Federation on fisheries and conservation of aquatic biological resources. Subject: compliance with the regulations of the state control (supervision) bodies.


# 422100170840
Unscheduled inspection
Start date: 2021-04-27, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Kemerovskoi oblasti
Purpose of inspection: This check is carried out for the purpose of: checking the issued prescription dated 04/27/2020 No. 225-GT. The objectives of this audit are to assess the adequacy of ongoing sanitary and epidemiological measures, identify and prevent violations of sanitary legislation. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies.


# 422100091434
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-23, duration: 15
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - Implementation of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor - Prevention, detection and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor). - Compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility "Uvalnaya Processing Plant" of JSC Sibirskaya Management Company. A dump for storing coal processing waste. Adjustment", as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (in the case of if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply), including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of building permits; compliance with the requirements of parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 422100088739
Unscheduled inspection
Start date: 2021-03-25, end date: —, duration: 20
Authority: YUzhno-Sibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This inspection is carried out on the basis of the application of JSC Sibirskaya Management Company (order No. 05/3740 dated 03/02/2021) for the issuance of an opinion from the federal State environmental supervision authority regarding the capital construction facility Uvalnaya Processing Plant of JSC Sibirskaya Management Company. A dump for storing coal processing waste. Adjustment". The purpose of this audit is to assess the possibility of issuing an opinion from the federal State environmental supervision authority regarding the capital construction facility Uvalnaya Concentrating Plant of Sibirskaya Management Company JSC. A dump for storing coal processing waste. Correction", located in the Kemerovo region, Novokuznetsk municipal district. The subject of this audit is the compliance of the information contained in the application and documents of JSC Sibirskaya Management Company for granting legal status with a special permit (license) for the right to carry out certain types of activities or permission (approval) for other legally significant actions, if an appropriate unscheduled audit of a legal entity or individual entrepreneur is provided for by the rules for granting legal status., special permits (licenses), permits (approvals) for mandatory requirements, as well as data on these legal entities and individual entrepreneurs contained in the unified State Register of Legal Entities, the unified State Register of Individual Entrepreneurs and other federal information resources.


# 422100017375
Unscheduled inspection
Start date: 2021-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 422100037350
Unscheduled inspection
Start date: 2021-02-25, end date: 2021-03-04, duration: 5
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms, Appeal no.42/7-205-21- ABOUT from 25.01.2021


# 422100006298
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-02-26, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the compliance of the work performed and the construction materials used during the reconstruction process, as well as the results of such work, with the requirements of the project documentation. The verification task is to determine the compliance of the reconstructed capital construction facility with the requirements of the design documentation. The subject of the audit is compliance with the mandatory requirements of the legislation of the Russian Federation on urban development activities.


# 002005160110
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-27, duration: 15
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the inspection program approved by the Deputy head of the Siberian Department of Rostechnadzor Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation Compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility "Uvalnaya Concentrating Plant" JSC Sibirskaya Management Company"Dump for storage of coal enrichment waste Correction" as well as the results of such work on project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004422954
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-11, duration: 9
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor, dated December 27, 2019. 4200718 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation Compliance of the work and the applied building materials and the results during the construction of the capital construction facility construction "Technical project for the development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the licensed areas "Field of the Uvalnaya mine" and "Uvalny Glubokoe" Adjustment of step 1 5" as well as the results of such work of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources availability of a construction permit compliance with the requirements Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 422004432161
Unscheduled inspection
Start date: 2020-06-17, end date: 2020-06-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: In order to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the task of verification is to determine the compliance of the constructed facility with the requirements of the design documentation, including the requirements in with regard to energy efficiency and requirements regarding the equipment of the capital construction facility with metering devices for used energy resources, the subject of verification is compliance with the requirements of the legislation of the Russian Federation in the field of urban planning


# 422004372582
Unscheduled inspection
Start date: 2020-03-19, end date: —, duration:
Authority:
Purpose of inspection:


# 002004311368
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-21, duration: 14
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor Detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentationconformity of the work performed and the construction materials used and the results during the construction of the capital construction facility, as well as the results of such work in the project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004251191
Unscheduled inspection
Start date: 2020-02-05, end date: 2020-02-27, duration:
Authority: Verhneobskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection: State control and supervision over compliance with the legislation of the Russian Federation in the field of fisheries and conservation of aquatic biological resources


# 422004291635
Unscheduled inspection
Start date: 2020-02-13, end date: 2020-03-06, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms


# 001904100765
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution of the violation specified in the instruction of the Siberian Directorate of Rostechnadzor dated 15112019 2501316, the deadline for which has expired Verification of the elimination by a legal entity of the violation specified in the instruction on the elimination of violations dated 15112019 2501316, the deadline for which has expired Compliance with the instructions of the federal state construction supervision authorities


# 421903991859
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration:
Authority:
Purpose of inspection:


# 001903912203
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-15, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Vygolov LP dated 06022018 4200718 Prevention detection and suppression of violations of legislation on urban development activities by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of a capital construction facility "Technical project for the development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the license areas "Uvalny Mine Field" and "Uvalny Glubokoe" Adjustment of Step 1 5, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 Articles 52 of the Urban Planning Code of the Russian Federation


# 421904042323
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-21, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms


# 001902839342
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-19, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Vygolov LP dated 06022018 4200718 Prevention detection and suppression of violations of legislation on urban development activities by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of a capital construction facility "Technical project for the development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the license areas "Uvalny Mine Field" and "Uvalny Glubokoe" Adjustment of Step 1 5, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 Articles 52 of the Urban Planning Code of the Russian Federation


# 421902669774
Unscheduled inspection
Start date: 2019-04-19, end date: 2019-05-23, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms and compliance with mandatory requirements and or requirements established by municipal legal acts


# 421902678927
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-04-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 001902606717
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-19, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by the Deputy Head of the Siberian Directorate of Rostechnadzor dated 06022018 4200718 Prevention detection and suppression of violations of the legislation on urban development activities by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of the work and the applied building materials and results during the construction of the capital construction facility "Technical Project development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the license areas "Field of the Uvalnaya Mine" and "Uvalny Glubokoe" Adjustment of Step 1 5, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 421902684499
Unscheduled inspection
Start date: 2019-04-26, end date: —, duration:
Authority:
Purpose of inspection:


# 421902684447
Unscheduled inspection
Start date: 2019-04-26, end date: 2019-05-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802375426
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of the fulfillment of the inspection instruction 02181706 dated 07122018 task verification of the elimination of violations during construction subject to the fulfillment of the inspection instruction 02181706 dated 07122018


# 421802374575
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of the fulfillment of the inspection instruction 02181705 dated 07122018 task verification of the elimination of violations during construction subject to the fulfillment of the inspection instruction 02181705 dated 07122018


# 421802185243
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802185228
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802381676
Unscheduled inspection
Start date: 2018-12-25, end date: 2018-12-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421802185203
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to check the fulfillment of the inspection instruction 02181701 from 08022018 the task is to check the elimination of violations during construction the subject is the fulfillment of the inspection instruction 02181701 from 08022018


# 421802185199
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the fulfillment of the inspection instruction 02181702 dated 28092018 the task is to verify the elimination of violations during construction the subject is the fulfillment of the inspection instruction 02181702 dated 28092018


# 001802173033
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-26, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Prevention detection and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, Monitoring the compliance of work performed and construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of project documentation, including energy efficiency requirements with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources are the availability of a construction permit, compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation during the construction of the capital construction facility "Uvalnaya Concentrating Plant" of JSC Sibirskaya Management Company located at Kemerovo Novokuznetsk municipal district of Uval region


# 001802171268
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor Prevention detection and suppression of violations of legislation on urban planning activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of the capital construction facility "Technical project for the development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the Uvalnaya Mine Field and Uvalny Glubokoe license areas Adjustment of Step 1 5, as well as the results of such work in project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code. The Code of the Russian Federation


# 421802213503
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421802344338
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802213528
Unscheduled inspection
Start date: 2018-12-19, end date: 2018-12-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802138613
Unscheduled inspection
Start date: 2018-11-20, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 001802171290
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution of the instruction of the Siberian Directorate of Rostechnadzor dated 31102018 2501236 on the elimination of identified offenses based on the notice of JSC Sibirskaya Management Company dated 16112018 181892OX vh 1318034 dated 16112018 on the elimination of violations Prevention detection and suppression of violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor including project documentation, Compliance with the regulations of the federal state construction supervision authorities


# 001802098705
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Notification of Sibirskaya Management Company JSC on the completion of construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including project documentation, Compliance control of work and construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation during the construction of the capital construction facility "Technical project development of the Uvalny coal deposit Development of reservoir 67 reserves within the boundaries of the licensed areas "Field of the Uvalnaya mine" and "Uvalny Glubokoe" Correction of the 1st stage" located at the address Kemerovo region Novokuznetsk municipal district Uval


# 421802004080
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421801913343
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-11-02, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Kemerovskoi oblasti
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction of the official authorized to carry out state sanitary and epidemiological supervision on the elimination of the detected violation dated September 28, 2017 1079, the deadline for the execution of the instruction is 01102018. The objectives of this inspection are the prevention detection suppression of violations of the requirements of current sanitary legislation. The subject of this inspection is the fulfillment of the instructions of the state control and supervision bodies


# 001801696466
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-10-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility on the basis of an inspection program Prevention detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and applied building materials and results during the construction of a capital construction facility, as well as the results of such work with the requirements of project documentation, including including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 421801900209
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-10-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800680746
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 421800681282
Unscheduled inspection
Start date: 2018-09-11, end date: 2018-09-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 001800681129
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision over an object of capital construction on the basis of a notice of completion of construction of a reconstruction of an object of capital construction Prevention detection and suppression of violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and applied building materials and results during the reconstruction of an object of capital construction, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 001800893343
Unscheduled inspection
Start date: 2018-09-05, end date: 2018-09-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility based on the inspection program dated 02042018 4200918 Prevention detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and applied building materials and results during the construction of a capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 421801669142
Unscheduled inspection
Start date: 2018-09-21, end date: 2018-09-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800643906
Unscheduled inspection
Start date: 2018-08-30, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 421800644575
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-09-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800643926
Unscheduled inspection
Start date: 2018-08-28, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 001800615208
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility based on the inspection program dated 06022018 4200718 Prevention detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and applied building materials and results during the construction of a capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 421800644439
Unscheduled inspection
Start date: 2018-08-29, end date: 2018-09-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800618969
Unscheduled inspection
Start date: 2018-08-08, end date: 2018-08-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to check the fulfillment of the inspection instruction 02141703 dated 03072018 the task is to check the elimination of violations during construction the subject is the fulfillment of the inspection instruction 02141703 dated 03072018


# 001800447177
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-07-06, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the fulfillment by JSC Sibirskaya Management Company of a previously issued instruction on the elimination of violations Verification of the elimination by a legal entity of violations specified in the instruction on the elimination of violations dated 27042018 25081 notification of the elimination of violations Compliance by the audited entity with the instructions of the Siberian Rostechnadzor Department


# 001800447171
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-07-06, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the fulfillment by JSC Sibirskaya Management Company of a previously issued instruction on the elimination of violations Verification of the elimination by a legal entity of violations specified in the instruction on the elimination of violations Compliance by the audited entity with the instructions of the Siberian Rostechnadzor Department


# 001800438196
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-07-06, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision over an object of capital construction on the basis of a notice of completion of construction of a reconstruction of an object of capital construction Prevention detection and suppression of violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and applied building materials and results during the reconstruction of an object of capital construction, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 421800421909
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 001800438421
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-09, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the fulfillment by JSC Sibirskaya Management Company of a previously issued instruction on the elimination of violations, the deadline for which has expired Verification of the elimination by a legal entity of violations specified in the instruction on the elimination of violations, the deadline for which has expired The fulfillment by the audited entity of the instruction of the Siberian Directorate of Rostechnadzor


# 421800465448
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800490515
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800399719
Unscheduled inspection
Start date: 2018-05-31, end date: 2018-06-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800357647
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800359627
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-05-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421800302597
Unscheduled inspection
Start date: 2018-04-18, end date: 2018-05-18, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Kemerovskoi oblasti
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction of the official authorized to carry out state sanitary and epidemiological supervision on the elimination of the detected violation dated September 28, 2017 1079, the deadline for the execution of the instruction is 04012018. The objectives of this inspection are the prevention detection suppression of violations of the requirements of the current sanitary legislation in the field of consumer protection. The subject of this inspection is the fulfillment of the instructions of the state control and supervision bodies


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.