# 002005213870
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005212153
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of a completion notice dated October 15, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005212139
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice dated October 16, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005211014
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005211013
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated October 20, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005199700
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated October 8, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005190903
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005185827
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005185823
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated September 28, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005185821
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated September 25, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005206087
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-12-04, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice dated October 14, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005142212
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-28, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice dated September 2, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004417814
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice 7SV41 dated April 30, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004417808
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 3ACH51 dated April 30, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004417800
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 3ACH51 dated April 30, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004417799
Unscheduled inspection
Start date: 2020-06-19, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004322487
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice 121 BC dated February 10, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts
# 002004322467
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice No. 47n dated February 10, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971651
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 16h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971566
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 26h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971632
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 17h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970438
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 30h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971541
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 27h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971477
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903971509
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 28h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971597
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903970424
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 32n dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970354
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 36n dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970409
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001903970334
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 39n dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970318
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the 40n completion notice dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970219
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903970401
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 34n dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970302
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 41n dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970187
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903970104
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice No. 313 dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970380
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903970089
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice 310 dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970289
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 42n dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970163
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice 324 dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970067
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903969901
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of a completion notice dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903969863
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the notice of completion DKS1 dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903969858
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-06, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the notice of completion of DKS2 dated November 1, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971718
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the 9h completion notice dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971701
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 10h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971677
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 11h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970116
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice No. 314 dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001902909202
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-20, duration: —
Authority: Uralskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of compliance of the activities carried out with the requirements of Federal Law No. 102FZ dated 26062008 "On ensuring the uniformity of measurements" assessment of compliance of the activities carried out with the mandatory requirements of Federal Law No. 184FZ dated December 27, 2002 "On Technical Regulation" Verification is carried out on the basis of the Order of the Head of UMTU Rosstandart Mikheeva SV dated 23072019 g 84 "On unscheduled documentary inspections of oil acceptance points through which oil is received, including acceptance points belonging to organizations not part of the Transneft Group that provide services for oil delivery to the system of trunk oil pipelines and do not have their own oil production facilities" issued in accordance with subparagraph 3 of Part 2 of Article 10 of the Federal Law of December 26, 2008 294 FZ "On the protection of the Rights of Legal Entities individuals and individual entrepreneurs in the implementation of state control supervision and municipal control" on the basis of the instruction of the Deputy Chairman of the Government of the Russian Federation DN Kozak dated 05062019 DKP94635 order of the Federal Agency for Technical Regulation and Metrology dated 19072019 1700
# 00170701685213
Unscheduled inspection
Start date: 2017-06-14, end date: 2017-06-23, duration: —
Authority: SeveroUralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: implementation of the previously issued prescription from 13032017 9TS
# 00170701723688
Unscheduled inspection
Start date: 2017-05-17, end date: 2017-06-02, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted for the purpose of verifying the completed construction of the capital construction facility "Development of the Achimov deposits of the Urengoy deposit of the Samburgsky license area 3rd stage of construction 1st stage based on the notice of completion of construction 31 and dated 14042017the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this audit is to comply with mandatory requirements and or requirements established by municipal authorities. legal acts
# 00160601554085
Unscheduled inspection
Start date: 2016-02-15, end date: 2016-02-29, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601554195
Unscheduled inspection
Start date: 2016-02-15, end date: 2016-02-29, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601554175
Unscheduled inspection
Start date: 2016-02-15, end date: 2016-02-29, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601554145
Unscheduled inspection
Start date: 2016-02-15, end date: 2016-02-29, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601554052
Unscheduled inspection
Start date: 2016-02-15, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00160601554298
Unscheduled inspection
Start date: 2016-02-15, end date: 2016-02-29, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601554128
Unscheduled inspection
Start date: 2016-02-15, end date: 2016-02-29, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 892101373598
Unscheduled inspection
Start date: 2021-11-19, end date: —, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmalo-Neneckogo avtonomnogo okruga
Purpose of inspection:
# 892100680203
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 722100274977
Unscheduled inspection
Start date: 2021-06-16, end date: —, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice No. 3 dated February 8, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility.
The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts
# 892100271315
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: 5
Authority: Departament prirodno-resursnogo regulirovaniya‚ lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmalo-Neneckogo avtonomnogo okruga
Purpose of inspection: Control of the execution of the regulation dated 12.07.2019 No. 11-T, 3-K
# 722100068492
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-23, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated February 19, 2021. No. NYA/14 for the purpose of monitoring the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility.
The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts.
# 722100068472
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-23, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated February 19, 2021. No. NYA/13 for the purpose of monitoring the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility.
The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts.
# 722100068470
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-23, duration: —
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice No. SV41/5 dated February 19, 2021 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility.
The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts.
# 722005280559
Unscheduled inspection
Start date: 2020-12-15, end date: —, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection:
# 002005213870
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice dated October 16, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements 7 The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 002005212153
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of a completion notice dated October 15, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005212137
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated October 20, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005212139
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice dated October 16, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005211014
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of a completion notice dated October 15, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005211013
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated October 20, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005199700
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated October 8, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005190903
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice dated October 5, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005185827
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the 18DKS completion notice dated September 28, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005185823
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated September 28, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005185821
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice dated September 25, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002005206087
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-12-04, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice dated October 14, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 722005191408
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005142212
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-28, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice dated September 2, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 722005195102
Unscheduled inspection
Start date: 2020-10-21, end date: —, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection:
# 722005171273
Unscheduled inspection
Start date: 2020-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 722005186941
Unscheduled inspection
Start date: 2020-10-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002004482651
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-09-16, duration: 30
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: based on Rostechnadzor's instruction dated July 10, 2020 000706578 in order to fulfill the instructions of Deputy Chairman of the Government of the Russian Federation Abramchenko VA dated June 4, 2020 WAP116041 dated June 17, 2020 WAP116495 and instructions from Deputy Chairman of the Government of the Russian Federation Borisov YU dated June 30, 2020 YUBP97031, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts The purpose of this audit is to note the necessary compliance by a legal entity individual entrepreneur in the process of carrying out activities in the field of industrial safety requirements, as well as compliance with the specified requirements of the buildings, premises, structures, technical devices, equipment and materials of the technological processes being carried out
# 722004324212
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-07-03, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: The audit is conducted in order to monitor the implementation of paragraphs 17 of the instruction on the elimination of identified violations dated 12072019 11T 3K, hereinafter referred to as the Instruction issued earlier by JSC Arktikgas, which expires on 15062020. The purpose of this audit is to verify the elimination of previously identified violations of the forest legislation of the Russian Federation. The purpose of this audit is to ensure that a legal entity complies with the mandatory requirements of the legislation of the Russian Federation in the field of forest relations
# 002004417848
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the 6DKS completion notice dated April 30, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts
# 002004417814
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice 7SV41 dated April 30, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004417808
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 3ACH51 dated April 30, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004417800
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 3ACH51 dated April 30, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004417799
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice 5ACH51 dated April 30, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004322487
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice 121 BC dated February 10, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. acts
# 002004322467
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice No. 47n dated February 10, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 002004322460
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 12h dated February 10, 2020 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971651
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 16h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971578
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 20h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971566
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 26h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971632
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 17h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903970438
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 30h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971541
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 27h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts
# 001903971610
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of the completion notice 18h dated October 28, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts