# 022101224885
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration: 20
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: --according to the inspection program dated 01/18/2021. (On-site engineering networks. Outdoor lighting. Landscaping).; --identification, prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation.; --compliance with mandatory requirements or requirements established by municipal legal acts;
# 022105324774
Unscheduled inspection
Start date: 2021-01-28, end date: 2021-02-25, duration: 20
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: according to the inspection program dated 01/18/2021
(1. ABC – finishing, engineering networks. 2. Laboratory building – external engineering networks, finishing works. 3.Repair shop - internal engineering networks, electrical work, installation of PVC windows, doors. Finishing. 4. Facilities of the technological line - installation of equipment; internal engineering networks, finishing. 5.CHECKPOINT. 6.On-site water supply and sanitation networks. 7. Sanitary-epidemiological, environmental measures. 8. Fire prevention measures. 9. Compliance with energy requirements and installation rules of electrical installations. 10. External engineering networks. – gas pipeline, HVAC, sewerage).-- the objectives of this audit are: identification, prevention and suppression of violations of the legislation on urban development, including technical regulations and project documentation.--compliance with mandatory requirements or requirements established by municipal legal acts;
# 002005289970
Unscheduled inspection
Start date: 2020-12-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 022005216771
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-12-04, duration: 20
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: in order to notify 2 on the elimination of violations during the construction of the reconstruction of the capital construction facility, according to regulation 57 of 11092020, the limestone unloading and crushing plant was installed on the inclined gallery, a technological pipeline from used metal pipes, the presence of sections with poorly vibrated concrete, it is necessary to carry out repair work at +7800 and at +11700 along the axis of the 3ZHD, the integrity of the bearing reinforced concrete monolithic plates due to drilling technological holes for air ducts To carry out measures to strengthen the load-bearing wall to restore the protective layer of concrete The executive documentation has not been provided in full xx 26668 of 30102020 the objectives of this inspection are to identify prevent and suppress violations of legislation on urban development, including technical regulations and design documentationcompliance with mandatory requirements or requirements established by municipal legal acts
# 022004490626
Unscheduled inspection
Start date: 2020-08-18, end date: —, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection:
# 022004402032
Unscheduled inspection
Start date: 2020-04-27, end date: 2020-05-28, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: according to the notice of the beginning of construction of the capital construction facility bn dated 16032020 bx 7244 dated 180320g identification prevention and suppression of violations of legislation on urban development activities, including technical regulations and project documentation compliance with mandatory requirements or requirements established by municipal legal acts