# 742101436081
Unscheduled inspection
Start date: 2021-12-15, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100257709
Unscheduled inspection
Start date: 2021-06-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100009037
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-02-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu konstrukcii 1 etazha pristroya i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
2. Nalichie razresheniya na stroitelstvo.
3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.
# 742005237371
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-11-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu nesuschih konstrukcii 910 etazhei ustroistvu fundamentov pristroya i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742004478155
Unscheduled inspection
Start date: 2020-08-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004425470
Unscheduled inspection
Start date: 2020-06-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004243830
Unscheduled inspection
Start date: 2020-02-04, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741904029205
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami 33651733 ot 24092019 srok ispolneniya 24102019
# 741904030220
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-12-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic frame, the installation of the outer and inner walls of the second floor, the installation of a monolithic frame, the installation of the outer and inner walls of the roof in operation after completion of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and equipment requirements capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903881417
Unscheduled inspection
Start date: 2019-10-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902992454
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic frame to the device of the external and internal walls of the second floor after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903079989
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: zaschita prav i interesov rabotnikov v svyazi s rassmotreniem obrascheniya ot 29072019 747336519OB
# 741902978514
Unscheduled inspection
Start date: 2019-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902816619
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-07-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the foundation slab after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902704145
Unscheduled inspection
Start date: 2019-05-17, end date: 2019-05-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot pri armirovanii betonirovanii i gidroizolyacii plity sten nizhe otm 0000 betonirovanii konstrukcii pristroya nizhe otm 0000 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741902736988
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-24, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: zaschity prav i interesov rabotnikov v svyazi s rassmotreniem obrascheniya ot 08052019 747201619OBobespechenie soblyudeniya rabotodatelem trudovogo zakonodatelstva RF i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava
# 741902373782
Unscheduled inspection
Start date: 2019-01-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802373770
Unscheduled inspection
Start date: 2018-12-28, end date: 2019-01-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka predpisaniya ot 24042018g 2 Sootvetstvie vypolneniya rabot po vnutrennei otdelke pomeschenii ustroistvu vnutrennego vodoprovoda otdelke cokolya blagoustroistvu i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 3 Nalichie razresheniya na stroitelstvo 4 Soblyudenie trebovanii ch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 741801892014
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-10-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po kamennoi kladke sten lestnichnoi kletki v osyah KL67 sten i peregorodok 1go etazha v osyah AB17 po ustroistvu perekrytiya 1go etazha i monolitnyh uchastkov na otm+4200 po montazhu ograzhdayuschih konstrukcii stenovyh sendvichpanelei do ustroistva ploskoi krovli i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741801935449
Unscheduled inspection
Start date: 2018-10-16, end date: 2018-10-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot pri ustroistve krovli zapolnenii okonnyh proemov etazhei do vypolneniya otkosov i ustanovki podokonnikov i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800629773
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-08-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot pri ustroistve nesuschih konstrukcii 5go 6go 7go etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800533478
Unscheduled inspection
Start date: 2018-07-11, end date: 2018-07-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka predpisaniya ot 24042018g 2 Nalichie razresheniya na stroitelstvo 3 Soblyudenie trebovanii ch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 741800536397
Unscheduled inspection
Start date: 2018-07-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800557666
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800284750
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu stalnogo karkasa v osyah E L” 1 7” podstropilnyh i stropilnyh ferm s otm+5515 do otm+7500 do nachala rabot po ustroistvu ploskoi krovli na otm+8322 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800272111
Unscheduled inspection
Start date: 2018-04-11, end date: 2018-04-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu ohrannopozharnoi signalizacii protivopozharnogo vodoprovoda ustroistvu vnutrennih elektricheskih setei montazhu vent fasadov soblyudenie protivopozharnyh i sanitarnoepidemiologicheskih meropriyatii i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Soblyudenie trebovanii ch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 741800299266
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-05-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot pri ustroistve nesuschih konstrukcii 3go etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF 4 Vypolnenie predpisaniya ot 28032017 g
# 741800201775
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-03-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot pri ustroistve nesuschih konstrukcii 2go etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800216528
Unscheduled inspection
Start date: 2018-03-23, end date: 2018-03-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Vypolnenie predpisaniya ot 19022018 goda 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800050519
Unscheduled inspection
Start date: 2018-02-13, end date: 2018-02-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu stalnogo karkasa zdaniya v osyah A E” 1 7” do nachala montazha plit perekrytii na otm+4200 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800050413
Unscheduled inspection
Start date: 2018-02-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802909123
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot pri ustroistve nesuschih konstrukcii 1go etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 74170802976927
Unscheduled inspection
Start date: 2017-12-21, end date: 2017-12-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of outdoor water supply networks concrete floors installation of aluminum structures stained glass windows landscaping of the adjacent territory and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of construction permits 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 74170802937778
Unscheduled inspection
Start date: 2017-12-14, end date: 2017-12-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu lentochnyh fundamentov iz blokov FBS s utepleniem po perimetru naruzhnyh sten po obratnoi zasypke pazuh kotlovana do nachala montazha stalnogo karkasa zdaniya v osyah “AL”“17” i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 74170802741385
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-10-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu naruzhnyh setei vodootvedeniya vnutrennih setei otopleniya vnutrennih setei vodosnabzheniya ventilyacii i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Soblyudenie trebovanii ch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 74170802762045
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu fundamentov i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 74170802707924
Unscheduled inspection
Start date: 2017-10-19, end date: —, duration: —
Authority: —
Purpose of inspection: