# 782101394150
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection:
# 782101394205
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782101345473
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: Inspection of the completed capital construction facility. Completion of measures to meet the mandatory requirements of fire safety, sanitary and epidemiological safety, and environmental safety.
# 782101158694
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration: 19
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: Completion of the building's frame (walls, columns, floors). Enclosing structures. The roof. Facade work.
# 782100438049
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration: 10
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: Completion of the preparatory period according to the PIC and the zero cycle (foundation and foundation, supporting structures up to approx. +0.000)
# 782100486010
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection:
# 782100413451
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782100460548
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration: 10
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: To establish that this check is being conducted in order to:
Scheduled inspection (according to the inspection program) - above-ground part (load-bearing and enclosing structures).
The objectives of this audit are:
prevention, detection and suppression of violations of the legislation on urban development and project documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor).
The subject of this review is:
1) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this The Code;
2) availability of a building permit;
3) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of this Code.
# 782100247620
Unscheduled inspection
Start date: 2021-06-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782100105634
Unscheduled inspection
Start date: 2021-04-05, end date: —, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: To establish that this check is being conducted in order to:
Scheduled inspection (according to the inspection program) - organization of the construction site (preparatory period), zero cycle (foundation, supporting structures up to approx. +0.000).
the objectives of this inspection are:
prevention, identification and suppression of violations committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as - contractor), violations of legislation on urban planning and project documentation.
The subject of this review is:
1) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this The Code;
2) availability of a building permit;
3) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of this Code.
# 782005253708
Unscheduled inspection
Start date: 2020-12-03, end date: 2020-12-30, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: To establish that this inspection is carried out in order to ensure that the work performed and the building materials used during the construction of a capital construction facility for the installation of a pile foundation tongue and groove fencing foundation pit parking as well as the results of such work, the performance of the indicators described in the construction permit, the objectives of this inspection are to prevent identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer, or the customer hereinafter referred to as the contractor for violations of the legislation on urban development and project documentationthe subject of this audit is to determine the compliance of the work performed with the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 782004485687
Unscheduled inspection
Start date: 2020-08-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004368410
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-26, duration: —
Authority: Komitet po stroitelstvu
Purpose of inspection: 51 This audit is conducted in order to monitor the Company's compliance with the requirements of legislation in the field of shared-equity construction of apartment buildings and other real estate objects in accordance with the tasks provided for by this order based on a reasoned submission dated 14022020 106UDS drawn up in connection with the identification of signs of violation of mandatory requirements established by legislation on participation in shared-equity construction of apartment buildings and or The objectives of this audit are to analyze the reliability of information provided by the Company as part of the Reporting and to analyze the calculation of the amount of funds of participants in shared-equity construction on the last calendar date of the reporting period attracted by the Company for the construction of capital construction facilities located at St. Petersburg Far Eastern Ave 15 lit A site 1 St. Petersburg Far Eastern Ave 15 lit A site 2SanctPeterburg Orlovodenisovsky Ave uch 6 southeast of the intersection with Suzdal Ave Sanktpeterburg Orlovodenisovsky Ave uch 3 southeast of the intersection with Suzdal Highway Sankt Petersburg Orlovodenisovsky Ave uch 10 southeast of the intersection with Suzdal Highway hereinafter referred to as the objectthe subject of this audit within the framework of achieving the goals and objectives of this order is compliance by the Company in the course of carrying out activities with the mandatory requirements of legislation in the field of shared-equity construction of apartment buildings and other real estate objects
# 782004387981
Unscheduled inspection
Start date: 2020-04-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 781903980490
Unscheduled inspection
Start date: 2019-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 781802200839
Unscheduled inspection
Start date: 2018-12-20, end date: 2019-01-24, duration: —
Authority: Komitet po stroitelstvu
Purpose of inspection: This audit is conducted in order to establish the correctness of the Company's calculation of the break-even ratio reflected in the Developer's Reports. The identified contradiction is indicated in the Conclusion. The purpose of this audit is to identify errors and or contradictions in calculating the break-even ratio in the developer's Reports to the requirements of the instructions approved by Order 06137pzn, as well as to confirm that the numerical value of the break-even ratio reflected in the developer's Reports meets the requirements of Resolution 233 The subject of this audit is compliance with the mandatory requirements established by the legislation on participation in the shared construction of apartment buildings and or other real estate objects in relation to the break-even ratio and its calculation.
# 781802149301
Unscheduled inspection
Start date: 2018-11-28, end date: —, duration: —
Authority: —
Purpose of inspection: